Saturday, August 22, 2009

August 20 Cabinet Finesse

Today Mesfin came to install the last two cabinets.

This one had been cut down to a 23" depth. Now we can visualize having a built-in dishwasher!

Craig and Danny leveled out the countertop.

This is the temporary cabinet which is removable. Someday if we want to rent out the duplex we will be able to put in a stacking washer/dryer.

Mesfin also put in the drawer. It was adjusted to clear the pesky breaker box.

Remember me?

Craig and Danny also filled in the gaps between the uneven ceiling and the cabinets, making this old imperfect house look level and new.

No comments:

Post a Comment